CPO® Certified & Licensed • Full Pool Remodelers

Full Pool Remodeling
& PebbleTec Resurfacing

Turn your dated, rough, or leaking 1980s/1990s pool into a modern Coastal & Canyon resort. We handle full chip-outs, PebbleTec finishes, Baja shelf additions, stone coping, in-house concrete decks, and 30-day chemical startups.

Full Swimming Pool Remodeling and PebbleTec Resurfacing in Aliso Viejo & Irvine CA
✓
7-to-14 Day Resurfacing Turnaround
In-House Tile · Coping · Concrete · Financing
Camp Pendleton & USMC/Navy • Orange County Military & First Responders • Military & First Responder Program

Complimentary Custom Gas Fire Pit or Smart LED Pool Upgrade Up to $3,500 Value

In honor of the aerospace engineers, test pilots, service members, and first responders who power the Orange County, OC Pool Pro (CPO® Certified & Licensed) includes a turnkey outdoor living or automation upgrade with every new in-ground pool build or full structural remodel.

Verified Eligibility:Camp Pendleton & USMC/NavyOrange County Military & First RespondersLockheed Martin Skunk WorksNorthrop GrummanBoeingNASA ArmstrongActive Military & VeteransFire & Law Enforcement
Select Your Included Build Incentive
  • Option A — Custom Masonry Gas Fire Pit ($3,500 Value): Hard-piped natural gas line, 150,000 BTU wind-rated stainless burner, stone veneer & fire glass.
  • Option B — Smart Wi-Fi Automation + Color LED Package ($3,200 Value): Jandy iAquaLink / Pentair app control for pool, spa, heater & multi-color LED lighting.
  • Included Bonus — Military & Aerospace Pool Financing: Reduced-fee Lyon Financial pool & hardscape programs up to $200,000 with terms up to 30 years.
(949) 619-8585
COMPLETE STRUCTURAL RENOVATIONS

Don't Just Patch Old Plaster—Reinvent Your Entire Backyard

Thousands of homes in Glenwood, West Aliso Viejo, Laguna Niguel, and West Irvine have pools built 20 to 35 years ago with etched white plaster, missing tiles, hollow coping stones, and cracked concrete decks.

Because OC Pool Pro performs both pool remodeling AND in-house masonry, concrete flatwork, fire pits, and artificial turf, we can modernize your pool shell and your surrounding patio simultaneously—backed by our 30-day Orenda LSI chemical startup.

  • Full pneumatic hydro-strip and chip-out down to solid structural gunite
  • Add a custom Baja tanning shelf, raised spillover spa, or sheer-descent waterfall wall
  • Replace cracked concrete decks with modern diamond-cut pads and artificial grass ribbons
  • Upgrade to 12V Nicheless color LED lighting and smartphone equipment controls
  • Finance 100% of your pool + deck remodel with low monthly payments via Lyon Financial
BeforeAfter
Before
After
REMODELING CAPABILITIES

Everything Your Pool Needs to Look Brand New

Full Chip-Out & Bond Coat

PebbleTec, Mini-Pebble & Quartz Replastering

Pneumatic chip-out of delaminated old plaster, structural crack injection, Multicoat bond coat, and hand-troweled PebbleTec, PebbleSheen, or Hydrazzo aggregate finishes.

Structural Shotcrete Modifications

Baja Tanning Ledge & Step Additions

Turn an unused deep end or narrow corner into a 6-foot-wide shallow sun shelf with LED bubbler fountains and built-in umbrella sleeves.

Frost-Proof Porcelain & Stone

Waterline Tile & Bullnose Coping Replacement

Remove scaled, cracked 1990s tile and brick coping; install modern 6x6 or 1x2 glass mosaic tile and cool-touch precast concrete or travertine coping.

Save Water & Heating Costs

Deep-End Play Pool Depth Conversions

Convert dangerous, hard-to-heat 9-foot diving bowls into modern 5.5-foot or 6-foot sports and lounging pools—cutting gas heating bills by up to 35%.

In-House Concrete & Masonry

Deck Tear-Out, Turf Ribbons & Fire Features

Jackhammer out heaved, cracked concrete decks and replace them with modern geometric concrete pads, artificial grass strips, and a poolside gas fire pit.

Jandy, Pentair & Hayward Pro

Complete Equipment Pad & Automation Retrofits

Upgrade rusted single-speed pumps and old DE grids to variable-speed pumps, salt chlorinators, 400k BTU low-NOx heaters, and smartphone automation.

DRAMATIC MAKEOVERS

Slide to Compare Before & After Remodels

BeforeAfter
Before
After
BeforeAfter
Before
After
BeforeAfter
Before
After
BeforeAfter
Before
After
BeforeAfter
Before
After
BeforeAfter
Before
After

Pool Remodeling & Resurfacing FAQs

How much does a full pool remodel cost in Aliso Viejo and Irvine?

Standard pool resurfacing with quartz or mini-pebble typically ranges from $7,500 to $13,500. A full structural remodel—including new waterline tile, precast or travertine coping, a custom Baja tanning shelf addition, LED lighting, and new diamond-cut concrete decking—generally ranges from $18,000 to $45,000+, with 100% financing available through Lyon Financial.

Can you add a shallow Baja tanning shelf or raised spa to an existing pool?

Yes! We epoxied-rebar dowel directly into your existing concrete shell and shoot structural shotcrete to add shallow 8-inch Baja shelves with umbrella sleeves, wide wedding-cake entry steps, underwater benches, or a brand-new raised spillover spa.

How long does a full pool remodel take from drain to refill?

A tile, coping, and PebbleTec resurfacing project typically takes 7 to 14 days from draining the pool to refilling it. Larger backyard transformations involving new concrete decking, retaining walls, fire pits, and artificial turf take 3 to 5 weeks.

Need Reliable Pool Care in Orange County?

Dispatched from Aliso Viejo (92656) for weekly pool cleaning, acoustic leak detection, escrow inspections & repairs.

OC Pool Pro • CPO-Certified Specialists606-P Avenida Sevilla, Laguna Woods, CA 92637 • Serving Aliso Viejo & All OC
Call Aliso Viejo Dispatch: (949) 619-8585
Or Request Fast Digital Quote
📞 (949) 619-8585